NIT No:67/AC-(5)54/NIT/BSNL/GHED/2020-21/21 |
23-JAN-21 16 / |
1/16/2021 16:02 |
ID: 11273 |
|
|
Replacement
of faulty Power Cable from ASEB Service Pole to Meter Panel at BTS Bakrapara.
Under Kamrup SSA (Estimated Cost: 13940) |
25-JAN-21
15.30 Hrs. |
|
|
Electrical Division, Guwahati |
NIT No:66/AC-(5)54/NIT/BSNL/GHED/2020-21/20 |
23-JAN-21 16 / |
1/16/2021 16:00 |
ID: 11272 |
|
|
Repairing
,Servicing & Replacement of unserviceble Battery of 3 KVA Online UPS at
2nd Floor ,CTO Bldg. Panbazar . (Estimated Cost: 37500) |
25-JAN-21
15.30 Hrs. |
|
|
Electrical Division, Guwahati |
NIT No:65/AC-(5)54/NIT/BSNL/GHED/2020-21/19 |
23-JAN-21 16 / |
1/16/2021 15:58 |
ID: 11271 |
|
|
Repairing
& Overhauling of Defective Pump motor sets at BSNL Bhavan
,Panbazar. (Estimated Cost: 37580) |
25-JAN-21
15.30 Hrs. |
|
|
Silchar SSA |
NIT No:WS-459/GM/SC/S&M/VTM/2020-21
Dated 15-01-2021 |
25-JAN-21 14.00 / |
1/15/2021 10:44 |
ID: 11270 |
|
|
Limited
tender for searching CAF, Scanning & printing of CAFs along with
documents for submission of VTM cases in Silchar SSA (Estimated Cost:
88000) |
27-JAN-21
15.00 Hrs. |
|
|
Civil Division, Guwahati |
NIT No:NITNo.32/BSNL/GHCD/20-21) |
11-JAN-21 16:00 / |
1/11/2021 16:54 |
ID: 11269 |
|
|
Replacement
of unserviceable water supply pipe lines, Drainage pipe lines , cleaning of
rusted G.I. pipe lines and Misc, works at BSNL Staff quarters compound
Adabari, Guwahati. (Estimated Cost: 187100.00) |
18-JAN-21
15:00 Hrs. |
|
|
Civil Division, Tezpur |
NIT No:NIT No. 41/NIT/BSNL/CD-TZP/2020-21 |
18-JAN-21 15:00 / |
1/11/2021 15:17 |
ID: 11268 |
|
|
C/o 15mtr / 20.0mtr high
RTT including foundation, erection, painting, aviation lamp, earthling and
cable runway at WARD No.6, BIHPURIA site under TEZPUR SSA(2nd Call)
(Estimated Cost: 493100) |
18-JAN-21 18:00 Hrs. |
|
|
Civil Division, Tezpur |
NIT No:NIT No. 40/NIT/BSNL/CD-TZP/2020-21 |
18-JAN-21 15:00 / |
1/11/2021 15:14 |
ID: 11267 |
|
|
C/o 15mtr / 20.0mtr high
RTT including foundation, erection, painting, aviation lamp, earthling and
cable runway at KETEKIBARI site under TEZPUR SSA (2nd Call) (Estimated
Cost: 493100) |
18-JAN-21 18:00 Hrs. |
|
|
Civil Division, Tezpur |
NIT No:NIT No. 39/NIT/BSNL/CD-TZP/2020-21 |
18-JAN-21 15:00 / |
1/11/2021 15:12 |
ID: 11266 |
|
|
C/o 15mtr / 20.0mtr high
RTT including foundation, erection, painting, aviation lamp, earthling and
cable runway at MAHALAXMI TEA ESTATE site under TEZPUR SSA(2nd Call)
(Estimated Cost: 493100) |
18-JAN-21 18:00 Hrs. |
|
|
Civil Division, Tezpur |
NIT No:NIT No. 38/NIT/BSNL/CD-TZP/2020-21 |
18-JAN-21 15:00 / |
1/11/2021 15:11 |
ID: 11265 |
|
|
C/o 15mtr / 20.0mtr high
RTT including foundation, erection, painting, aviation lamp, earthling and
cable runway at GANGMOUTHAN site under TEZPUR SSA(2ndCall) (Estimated
Cost: 493100) |
18-JAN-21 18:00 Hrs. |
|
|
Civil Division, Tezpur |
NIT No:NIT No. 37/NIT/BSNL/CD-TZP/2020-21 |
16-JAN-21 15:00 / |
1/11/2021 11:40 |
ID: 11264 |
|
|
C/o 15mtr / 20.0mtr high
RTT including foundation, erection, painting, aviation lamp, earthling and
cable runway at BIHPUKHURI site under TEZPUR SSA(2nd Call) (Estimated
Cost: 493100) |
16-JAN-21 18:00 Hrs. |
|
|
Civil Division, Tezpur |
NIT No:NIT No. 36/NIT/BSNL/CD-TZP/2020-21 |
16-JAN-21 15:00 / |
1/11/2021 11:39 |
ID: 11263 |
|
|
C/o 15mtr / 20.0mtr high
RTT including foundation, erection, painting, aviation lamp, earthling and
cable runway at LEHUGAON TINIALI site under Tezpur SSA (2nd Call)
(Estimated Cost: 493100) |
16-JAN-21 18:00 Hrs. |
|
|
Civil Division, Tezpur |
NIT No:NIT No. 35/NIT/BSNL/CD-TZP/2020-21 |
16-JAN-21 15:00 / |
1/11/2021 11:35 |
ID: 11262 |
|
|
C/o 15mtr / 20.0mtr high
RTT including foundation, erection, painting, aviation lamp, earthling and
cable runway at KUMARGAON site under Nagaon SSA(2nd Call) (Estimated
Cost: 493100) |
16-JAN-21 18:00 Hrs. |
|
|
Civil Division, Tezpur |
NIT No:NIT No. 34/NIT/BSNL/CD-TZP/2020-21 |
16-JAN-21 15:00 / |
1/11/2021 11:34 |
ID: 11261 |
|
|
C/o 15mtr / 20.0mtr high
RTT including foundation, erection, painting, aviation lamp, earthling and
cable runway at SILCHANG site under Nagaon SSA (2nd Call) (Estimated
Cost: 493100) |
16-JAN-21 18:00 Hrs. |
|
|
Civil Division, Tezpur |
NIT No:NIT No. 33/NIT/BSNL/CD-TZP/2020-21 |
16-JAN-21 15:00 / |
1/11/2021 11:32 |
ID: 11260 |
|
|
C/o 15mtr / 20.0mtr high
RTT including foundation, erection, painting, aviation lamp, earthling and
cable runway at TELAHI site under Nagaon SSA(2nd Call) (Estimated Cost:
493100) |
16-JAN-21 18:00 Hrs. |
|
|
Civil Division, Tezpur |
NIT No:NIT No. 32/NIT/BSNL/CD-TZP/2020-21 |
16-JAN-21 15:00 / |
1/11/2021 11:30 |
ID: 11259 |
|
|
C/o 15mtr / 20.0mtr high
RTT including foundation, erection, painting, aviation lamp, earthling and
cable runway at AKORABORI site under Nagaon SSA(2nd Call) (Estimated
Cost: 493100) |
16-JAN-21 18:00 Hrs. |
|
|
Civil Division, Tezpur |
NIT No:NIT No. 28/NIT/BSNL/CD-TZP/2020-21 |
15-JAN-21 15:00 / |
1/7/2021 15:47 |
ID: 11258 |
|
|
C/o 15mtr / 20.0mtr high
RTT including foundation, erection, painting, aviation lamp, earthling and
cable runway at AAUNIATI site under Nagaon SSA (2nd Call) (Estimated
Cost: 493100) |
15-JAN-21 18:00 Hrs. |
|
|
Civil Division, Tezpur |
NIT No:NIT No. 31/NIT/BSNL/CD-TZP/2020-21 |
15-JAN-21 15:00 / |
1/7/2021 15:44 |
ID: 11257 |
|
|
C/o 15mtr / 20.0mtr high
RTT including foundation, erection, painting, aviation lamp, earthling and
cable runway at BATAMARI site under Nagaon SSA (2nd Call) (Estimated
Cost: 493100) |
15-JAN-21 18:00 Hrs. |
|
|
Civil Division, Tezpur |
NIT No:NIT No. 30/NIT/BSNL/CD-TZP/2020-21 |
15-JAN-21 15:00 / |
1/7/2021 15:42 |
ID: 11256 |
|
|
C/o 15mtr / 20.0mtr high
RTT including foundation, erection, painting, aviation lamp, earthling and
cable runway at site near BHAIRABI MANDIR under Tezpur SSA(2nd Call)
(Estimated Cost: 493100) |
15-JAN-21 18:00 Hrs. |
|
|
Civil Division, Tezpur |
NIT No:NIT No. 29/NIT/BSNL/CD-TZP/2020-21 |
15-JAN-21 15:00 / |
1/7/2021 15:40 |
ID: 11255 |
|
|
C/o 15mtr / 20.0mtr high
RTT including foundation, erection, painting, aviation lamp, earthling and
cable runway at RAIDANGIA site under Nagaon SSA (2nd Call) (Estimated
Cost: 493100) |
15-JAN-21 18:00 Hrs. |
|
|
Civil Division, Tezpur |
NIT No:NIT No. 27/NIT/BSNL/CD-TZP/2020-21 |
15-JAN-21 15:00 / |
1/7/2021 15:37 |
ID: 11254 |
|
|
C/o 15mtr / 20.0mtr high
RTT including foundation, erection, painting, aviation lamp, earthling and
cable runway at KETLA (CATHOLIC CHURCH) site under Tezpur SSA(2nd Call)
(Estimated Cost: 493100) |
15-JAN-21 18:00 Hrs. |
|
|
Civil Division, Tezpur |
NIT No:NIT No. 26/NIT/BSNL/CD-TZP/2020-21 |
15-JAN-21 15:00 / |
1/7/2021 15:35 |
ID: 11253 |
|
|
C/o 15mtr / 20.0mtr high
RTT including foundation, erection, painting, aviation lamp, earthling and
cable runway at HATBOR site under Nagaon SSA (2nd Call) (Estimated
Cost: 493100) |
15-JAN-21 18:00 Hrs. |
|
|
Electrical Division, Guwahati |
NIT No:63/AC(5)54/NIT/BSNL/GHED/2020-21/03 |
19-JAN-21 16.00 / |
1/7/2021 13:33 |
ID: 11252 |
|
|
Repairing / Modification of
100 KVA Substation at Type- V Quarter Dacaipatty , Silchar. (Estimated
Cost: 38593) |
21-JAN-21 15.00 Hrs. |
|
|
Civil Division, Guwahati |
NIT No:NITNo28/BSNL/GHCD/20-21) |
12-JAN-21 16:00 / |
1/5/2021 12:56 |
ID: 11251 |
|
|
Miscellaneous repair works
including painting to pole structure and runway at Harishabha BTS, Pan Bazar,
Guwahati (Estimated Cost: 60263.00) |
13-JAN-21 15:00 Hrs. |
|
|
Civil Division, Guwahati |
NIT No:NITNo29/BSNL/GHCD/20-21) |
12-JAN-21 16:00 / |
1/5/2021 12:54 |
ID: 11250 |
|
|
Dismantling of aluminum
partitions/false ceilings and erection of aluminum partitions/ doors with
available materials at Ulubari Telephone exchange , Guwahati including
carriage of dismantled materials to BSNL store at Dispur (Estimated
Cost: 45586.00) |
13-JAN-21 15:00 Hrs. |
|
|
Civil Division, Guwahati |
NIT No:31/BSNL/GHCD/2020-21 |
12-JAN-21 18:00 / |
1/5/2021 12:52 |
ID: 11249 |
|
|
Arrangement of potable
water supply at BSNL Staff Quarter wireless compound, Dispur, Guwahati
Assam (Estimated Cost: 234240.00) |
18-JAN-21 15:00 Hrs. |
|
|
Civil Division, Guwahati |
NIT No:NITNo30/BSNL/GHCD/20-21) |
12-JAN-21 16:00 / |
1/5/2021 12:48 |
ID: 11248 |
|
|
Replacement of
unserviceable WC pan, curtain rods and misc. civil works of Type-V staff
quarter No. 602 (CGM (NETF)post attached) at CTO compound Guwahati
(Estimated Cost: 45389.00) |
13-JAN-21 15:00 Hrs. |
|
|
Electrical Division, Guwahati |
NIT No:62/AC-5(54)/NIT/BSNL/GHED/2020-21 |
10-JAN-21 16 / |
1/4/2021 16:15 |
ID: 11247 |
|
|
Repairing & Servicing
of 320 KVA ( Cummines) DEA set at TE Bldg ,Bongaigaon ,Under Bongaigaon
SSA). (Estimated Cost: 85537) |
12-JAN-21 15.30 Hrs. |
|
|
Electrical Division, Guwahati |
NIT No:61/AC (5)54/NIT/BSNL/GHED/2020-21 |
10-JAN-21 16 / |
1/4/2021 16:12 |
ID: 11246 |
|
|
Replacement of faulty GOAB,
DOLU Fuse unit ,LA with allied electrical Works at TE Bongaigaon ,Paglasthan
. (Estimated Cost: 86779) |
12-JAN-21 15.30 Hrs. |
|
|
Civil Division, Guwahati |
NIT No:NITNo.27/BSNL/GHCD/20-21) |
06-JAN-21 18:00 / |
1/1/2021 15:39 |
ID: 11245 |
|
|
Addition,alteration, Repairing and maintenance works For
First Floor Academic block at RTTC compound Dharapur, Guwahati
(Estimated Cost: 19,79,673.00) Corrigendum |
08-JAN-21 15:00 Hrs. |
|
|
Civil Division, Guwahati |
NIT No:NITNo.26/BSNL/GHCD/20-21) |
06-JAN-21 18:00 / |
1/1/2021 15:37 |
ID: 11244 |
|
|
Addition, alteration, Repairing & maintenance works for
Hostel Block at RTTC compound Dharapur, Guwahati Dharapur, Guwahati
(Estimated Cost: 14,81,497.00) Corrigendum |
08-JAN-21 15:00 Hrs. |
|
|
Civil Division, Guwahati |
NIT No:25/BSNL/GHCD/2020-21 |
06-JAN-21 18.00 / |
1/1/2021 15:33 |
ID: 11243 |
|
|
Repairing and maintenance works of staff quarter block at
RTTC compound Dharapur, Guwahati . (Estimated Cost:
291471.00) Corrigendum |
08-JAN-21 15:00 Hrs. |
|
|
Bongaigaon SSA |
NIT No:Tender No: WX-9613/Tender/Rigger/2020-21/14 Dated:
23-12-2020 |
20-JAN-21 14.00 Hrs / |
12/29/2020 13:38 |
ID: 11242 |
|
|
E-Tender for Providing
Rigger Services on Call Basis (Per Day Basis) for R. F. Optimization &
Micro alignment of GSM, Wi-Fi Hot Spot, Minilink & Radio Modem etc of
Bongaigaon SSA (Estimated Cost: 11,68,221/-) |
20-JAN-21 14:00 Hrs
Hrs. |
|
|
Civil Division, Silchar |
NIT No:08/CD- BSNL / SC/2020 - 2021/CSD/Silchar |
05-JAN-21 16.00 / |
12/28/2020 16:35 |
ID: 11241 |
|
|
Surging of Deep Tube Well
and removal of damaged basin pipe etc. in Qtr No7,T-III at BSNL Qtr.
compound, Karimganj.(Silchar SSA) (Estimated Cost: 45890) |
06-JAN-21 15.00 Hrs. |
|
|
Civil Division, Silchar |
NIT No:07/CD-BSNL/SC/2020-2021/CSD/Silchar |
05-JAN-21 16.00 / |
12/28/2020 16:31 |
ID: 11240 |
|
|
Removing water leackage
problem of Qtr No-4/II, A Block at Hailakandi.(Silchar SSA) (Estimated
Cost: 31275) |
06-JAN-21 15.00 Hrs. |
|
|
Civil Division, Silchar |
NIT No:06/CD-BSNL/SC/2020-2021/CSD/Silchar |
05-JAN-21 16.00 / |
12/28/2020 16:28 |
ID: 11239 |
|
|
Cleaning of water treatment
plant ( Filter ), underground sump, Septic tank, manholes and drain at
National Highway qtr. Complex, Silchar. (Estimated Cost: 57275) |
06-JAN-21 15.00 Hrs. |
|
|
Electrical Division, Guwahati |
NIT No:60//AC-(5)54/NIT/BSNL/GHED/2020-21/18 |
31-DEC-20 16 / |
12/23/2020 14:48 |
ID: 11238 |
|
|
Modification of computer
wiring ,Data cable with allied Electrical works at 2 nd floor Planning &
General Section ,BSNL ,Bhawan,Panbazar, Guwahati. (Estimated Cost:
44410) |
02-JAN-21 15.30 Hrs. |
|
|
Electrical Division, Guwahati |
NIT No:59//AC-(5)54/NIT/BSNL/GHED/2020-21/17 |
31-DEC-20 16 / |
12/23/2020 14:46 |
ID: 11237 |
|
|
Repairing, rewinding of
faulty 25KVA transformer & ITC of repaired transformer at BTS Gurmow
Under Kamrup SSA. (Estimated Cost: 35090) |
02-JAN-21 15.30 Hrs. |
|
|
Electrical Division, Guwahati |
NIT No:58//AC-(5)54/NIT/BSNL/GHED/2020-21/16 |
31-DEC-20 16 / |
12/23/2020 14:44 |
ID: 11236 |
|
|
Replacement of faulty Power
Cable from ASEB Service Pole to Meter Panel at BTS Kalakhetra. Under Kamrup
SSA (Estimated Cost: 42933) |
02-JAN-21 15.30 Hrs. |
|
|
Electrical Division, Guwahati |
NIT No:57/AC-(5)54/NIT/BSNL/GHED/2020-21/15 |
31-DEC-20 16 / |
12/23/2020 14:42 |
ID: 11235 |
|
|
Replacement of faulty Power
Cable from ASEB Service Pole to Meter Panel at BTS Incometax Coolnoy. Under
Kamrup SSA. (Estimated Cost: 17797) |
02-JAN-21 15.30 Hrs. |
|
|
Civil Division, Guwahati |
NIT No:NITNo24/BSNL/GHCD/20-21) |
21-DEC-20 16:00 / |
12/18/2020 15:33 |
ID: 11234 |
|
|
Repairs and Maintenance
works of Toilet blocks ,Drainage lines ,removing of tree plants outer side
walls and Misc, works at Telephone Exchange Building Panbazar Guwahati
(Estimated Cost: 188610.00) |
23-DEC-20 15:00 Hrs. |
|
|
Civil Division, Tezpur |
NIT No:NIT No. 25/NIT/BSNL/CD-TZP/2020-21 |
26-DEC-20 15:00 / |
12/18/2020 13:28 |
ID: 11233 |
|
|
C/o 15mtr / 20.0mtr high
RTT including foundation, erection, painting, aviation lamp, earthling and
cable runway at WARD No.6, BIHPURIA site under TEZPUR SSA (Estimated
Cost: 493100) |
26-DEC-20 18:00 Hrs. |
|
|
Civil Division, Tezpur |
NIT No:NIT No. 24/NIT/BSNL/CD-TZP/2020-21 |
26-DEC-20 15:00 / |
12/18/2020 13:25 |
ID: 11232 |
|
|
C/o 15mtr / 20.0mtr high
RTT including foundation, erection, painting, aviation lamp, earthling and
cable runway at KETEKIBARI site under TEZPUR SSA (Estimated Cost:
493100) |
26-DEC-20 18:00 Hrs. |
|
|
Civil Division, Tezpur |
NIT No:NIT No. 23/NIT/BSNL/CD-TZP/2020-21 |
26-DEC-20 15:00 / |
12/18/2020 13:22 |
ID: 11231 |
|
|
C/o 15mtr / 20.0mtr high
RTT including foundation, erection, painting, aviation lamp, earthling and
cable runway at MAHALAXMI TEA ESTATE site under TEZPUR SSA (Estimated
Cost: 493100) |
26-DEC-20 18:00 Hrs. |
|
|
Civil Division, Tezpur |
NIT No:NIT No. 22/NIT/BSNL/CD-TZP/2020-21 |
26-DEC-20 15:00 / |
12/18/2020 13:21 |
ID: 11230 |
|
|
C/o 15mtr / 20.0mtr high
RTT including foundation, erection, painting, aviation lamp, earthing and
cable runway at RAJAPUKHURI under Tezpur SSA (Estimated Cost: 493100) |
26-DEC-20 18:00 Hrs. |
|
|
Civil Division, Tezpur |
NIT No:NIT No. 21/NIT/BSNL/CD-TZP/2020-21 |
26-DEC-20 15:00 / |
12/18/2020 13:15 |
ID: 11229 |
|
|
C/o 15mtr / 20.0mtr high
RTT including foundation, erection, painting, aviation lamp, earthing and
cable runway at SILBARI under Tezpur SSA (Estimated Cost: 493100) |
26-DEC-20 18:00 Hrs. |
|
|
Civil Division, Tezpur |
NIT No:NIT No. 20/NIT/BSNL/CD-TZP/2020-21 |
26-DEC-20 15:00 / |
12/18/2020 13:13 |
ID: 11228 |
|
|
C/o 15mtr / 20.0mtr high
RTT including foundation, erection, painting, aviation lamp, earthling and
cable runway at GANGMOUTHAN site under TEZPUR SSA (Estimated Cost:
493100) |
26-DEC-20 18:00 Hrs. |
|
|
Civil Division, Tezpur |
NIT No:NIT No. 19/NIT/BSNL/CD-TZP/2020-21 |
26-DEC-20 15:00 / |
12/18/2020 13:11 |
ID: 11227 |
|
|
C/o 15mtr / 20.0mtr high
RTT including foundation, erection, painting, aviation lamp, earthing and
cable runway at BIHPUKHURI under Tezpur SSA (Estimated Cost: 493100) |
26-DEC-20 18:00 Hrs. |
|
|
Electrical Division, Guwahati |
NIT No:54/AC-(5)54/NIT/BSNL/GHED/2020-21 |
24-DEC-20 16 / |
12/15/2020 12:18 |
ID: 11226 |
|
|
Providing Electro
-Mechanical Infrastructure works for GSAT-29 Gateways at RTTC
,Dharapur,Guwahati.( SH:- Supplying & Fixing of changeover switch allied
electrical works). (Estimated Cost: 98010) |
26-DEC-20 15.30 Hrs. |
|
|
Electrical Division, Guwahati |
NIT No:56/AC-5(54)/NIT/GHED/20-21 |
14-DEC-20 16 / |
12/14/2020 16:11 |
ID: 11225 |
|
|
Restoration of power supply
by Hired transformer and repairing, rewinding & ITC of repaied 63 KVA Cu
wound transformer at TE Boko , Under Kamrup SSA . (Estimated Cost:
80600) |
26-DEC-20 15.30 Hrs. |
|
|
Civil Division, Tezpur |
NIT No:NIT No. 18/NIT/BSNL/CD-TZP/2020-21 |
23-DEC-20 15:00 / |
12/14/2020 14:51 |
ID: 11224 |
|
|
C/o 15mtr / 20.0mtr high
RTT including foundation, erection, painting, aviation lamp, earthing and
cable runway at LEHUGAON TINIALI under Tezpur SSA (Estimated Cost:
493100) |
23-DEC-20 18:00 Hrs. |
|
|
Civil Division, Tezpur |
NIT No:NIT No. 17/NIT/BSNL/CD-TZP/2020-21 |
23-DEC-20 15:00 / |
12/14/2020 14:49 |
ID: 11223 |
|
|
- C/o 15mtr / 20.0mtr high
RTT including foundation, erection, painting, aviation lamp, earthing and
cable runway at KUMARGAON under Nagaon SSA (Estimated Cost: 493100) |
23-DEC-20 18:00 Hrs. |
|
|
Civil Division, Tezpur |
NIT No:NIT No. 16/NIT/BSNL/CD-TZP/2020-21 |
23-DEC-20 15:00 / |
12/14/2020 14:47 |
ID: 11222 |
|
|
C/o 15mtr / 20.0mtr high
RTT including foundation, erection, painting, aviation lamp, earthing and
cable runway at SILCHANG under Nagaon SSA (Estimated Cost: 493100) |
23-DEC-20 18:00 Hrs. |
|
|
Civil Division, Tezpur |
NIT No:NIT No. 15/NIT/BSNL/CD-TZP/2020-21 |
23-DEC-20 15:00 / |
12/14/2020 14:45 |
ID: 11221 |
|
|
- C/o 15mtr / 20.0mtr high
RTT including foundation, erection, painting, aviation lamp, earthing and
cable runway at TELAHI under Nagaon SSA (Estimated Cost: 493100) |
23-DEC-20 18:00 Hrs. |
|
|
Civil Division, Tezpur |
NIT No:NIT No. 14/NIT/BSNL/CD-TZP/2020-21 |
23-DEC-20 15:00 / |
12/14/2020 14:43 |
ID: 11220 |
|
|
C/o 15mtr / 20.0mtr high
RTT including foundation, erection, painting, aviation lamp, earthing and
cable runway at JAMUGURI under Nagaon SSA (Estimated Cost: 493100) |
23-DEC-20 18:00 Hrs. |
|
|
Civil Division, Tezpur |
NIT No:NIT No. 13/NIT/BSNL/CD-TZP/2020-21 |
23-DEC-20 15:00 / |
12/14/2020 14:41 |
ID: 11219 |
|
|
C/o 15mtr / 20.0mtr high
RTT including foundation, erection, painting, aviation lamp, earthing and
cable runway at AKORABORI under Nagaon SSA (Estimated Cost: 493100) |
23-DEC-20 18:00 Hrs. |
|
|
Civil Division, Guwahati |
NIT No:NITNo23/BSNL/GHCD/20-21) |
15-DEC-20 16:00 / |
12/11/2020 13:39 |
ID: 11218 |
|
|
Miscellaneous Civil
Maintenance works to transit quarter building including repairs to RCC
overhead staging, water supply distribution lines at BSNL compound, LS Road ,
Pan Bazar, Guwahati. (Estimated Cost: 55988.00) |
16-DEC-20 15:00 Hrs. |
|
|
Civil Division, Jorhat |
NIT No:11/BSNL/CD-JRT/2020-21 |
10-DEC-20 18:30 / |
12/10/2020 16:58 |
ID: 11217 |
|
|
Construction of
15.00M/20.00 M high Roof Top Tower including foundation, erection, painting,
aviation lamp, earthing, and cable runway etc. at Chalihanagar,Gelapukhuri-2
under Dibrugarh SSA. (Estimated Cost: 498239) |
17-DEC-20 18:00 Hrs. |
|
|
Civil Division, Jorhat |
NIT No:10/BSNL/CD-JRT/2020-21 |
10-DEC-20 18:30 / |
12/10/2020 16:55 |
ID: 11216 |
|
|
Construction of
15.00M/20.00 M high Roof Top Tower including foundation, erection, painting,
aviation lamp, earthing, and cable runway etc. at Sarupathar,Joyanagar under
Dibrugarh SSA(2nd call). (Estimated Cost: 498239) |
17-DEC-20 18:00 Hrs. |
|
|
Civil Division, Jorhat |
NIT No:09?BSNL/CD-JRT/2020-21 |
10-DEC-20 18:30 / |
12/10/2020 16:52 |
ID: 11215 |
|
|
Construction of
15.00M/20.00 M high Roof Top Tower including foundation, erection, painting,
aviation lamp, earthing, and cable runway etc. at Madhuban,PO-Naholia under
Dibrugarh SSA(2nd call). (Estimated Cost: 498239) |
17-DEC-20 18:00 Hrs. |
|
|
Civil Division, Jorhat |
NIT No:08/BSNL/CD-JRT/2020-21 |
10-DEC-20 18:30 / |
12/10/2020 16:50 |
ID: 11214 |
|
|
Construction of
15.00M/20.00 M high Roof Top Tower including foundation, erection, painting,
aviation lamp, earthing, and cable runway etc. at MohanbariBazar,Airport
under Dibrugarh SSA(2nd call). (Estimated Cost: 498239) |
17-DEC-20 18:00 Hrs. |
|
|
Civil Division, Jorhat |
NIT No:07/BSNL/CD-JRT/2020-21 |
10-DEC-20 18:30 / |
12/10/2020 16:47 |
ID: 11213 |
|
|
Construction of
15.00M/20.00 M high Roof Top Tower including foundation, erection, painting,
aviation lamp, earthing, and cable runway etc. at TI Ford , Laipuli under
Dibrugarh SSA(2nd call). (Estimated Cost: 498239) |
17-DEC-20 18:00 Hrs. |
|
|
Circle Office, Guwahati |
NIT No:ASM/Mktg/EOI-Franchisee/2019-20/35 Dated 09/12/2020 |
18-DEC-20 14:00 / |
12/10/2020 11:02 |
ID: 11212 |
|
|
****EOI**** Expression of
Interest for Franchisee-ship of sale of BSNL products and provision of
services to BSNL in KAMRUP SSA( Franchisee area of “Bijoy nagar,Kamrup Rural
PSA” ) (Estimated Cost: 0) |
18-DEC-20 17:30 Hrs. |
|
|
Civil Division, Guwahati |
NIT No:NITNo22/BSNL/GHCD/20-21) |
08-DEC-20 18:00 / |
12/2/2020 11:35 |
ID: 11211 |
|
|
Construction of 15 M/21 M
high Roof Top Tower including erection, earthing, painting , aviation lamp
and cable runway etc. at Titkuri under kamrup SSA (Estimated Cost:
529068.00) |
11-DEC-20 15:00 Hrs. |
|
|
Civil Division, Guwahati |
NIT No:NITNo.20/BSNL/GHCD/20-21) |
08-DEC-20 18:00 / |
12/2/2020 11:33 |
ID: 11210 |
|
|
Construction of 15 M/21 M
high Roof Top Tower including erection, earthing, painting , aviation lamp
and cable runway etc. at Malidhaba, Santola under kamrup SSA .
(Estimated Cost: 529068.00) |
11-DEC-20 15:00 Hrs. |
|
|
Civil Division, Guwahati |
NIT No:NITNo19/BSNL/GHCD/20-21) |
08-DEC-20 18:00 / |
12/2/2020 11:31 |
ID: 11209 |
|
|
Construction of 15 M/21 M
high Roof Top Tower including erection, earthing, painting , aviation lamp
and cable runway etc. at Garal under kamrup SSA . (Estimated Cost:
529068.00) |
11-DEC-20 15:00 Hrs. |
|
|
Civil Division, Guwahati |
NIT No:NITNo.21/BSNL/GHCD/20-21) |
08-NOV-20 18:00 / |
12/2/2020 11:28 |
ID: 11208 |
|
|
Construction of 15 M/21 M
high Roof Top Tower including erection, earthing, painting , aviation lamp
and cable runway etc. at Sonapur Baligate under kamrup SSA . (Estimated
Cost: 529068.00) |
11-DEC-20 15:00 Hrs. |
|
|
Civil Division, Tezpur |
NIT No:NIT No. 12/NIT/BSNL/CD-TZP/2020-21 |
08-DEC-20 16:00 / |
11/26/2020 15:59 |
ID: 11207 |
|
|
Constr of 15mtr to 20.0mtr
high RTT including foundation, erection, painting, aviation lamp, earthling
and cable runway at DEMOW site under Nagaon SSA (Estimated Cost:
493100) |
08-DEC-20 18:00 Hrs. |
|
|
Civil Division, Tezpur |
NIT No:NIT No. 11/NIT/BSNL/CD-TZP/2020-21 |
08-DEC-20 16:00 / |
11/26/2020 15:56 |
ID: 11206 |
|
|
Constr of 15mtr to 20.0mtr
high RTT including foundation, erection, painting, aviation lamp, earthling
and cable runway at RAHA-2 site under Nagaon SSA (Estimated Cost:
493100) |
08-DEC-20 18:00 Hrs. |
|
|
Civil Division, Tezpur |
NIT No:NIT No. 10/NIT/BSNL/CD-TZP/2020-21 |
08-DEC-20 16:00 / |
11/26/2020 15:53 |
ID: 11205 |
|
|
Constr of 15mtr to 20.0mtr
high RTT including foundation, erection, painting, aviation lamp, earthling
and cable runway at BATAMARI site under Nagaon SSA (Estimated Cost:
493100) |
08-DEC-20 18:00 Hrs. |
|
|
Civil Division, Tezpur |
NIT No:NIT No. 09/NIT/BSNL/CD-TZP/2020-21 |
08-DEC-20 16:00 / |
11/26/2020 15:50 |
ID: 11204 |
|
|
Constr of 15mtr to 20.0mtr
high RTT including foundation, erection, painting, aviation lamp, earthling
and cable runway at site near BHAIRABI MANDIR under Tezpur SSA
(Estimated Cost: 493100) |
08-DEC-20 18:00 Hrs. |
|
|
Electrical Division, Guwahati |
NIT No:53/AC-(5)54/NIT/BSNL/GHED/2020-21/14 |
30-NOV-20 16 / |
11/23/2020 14:09 |
ID: 11203 |
|
|
Repalcement of faulty Fans
& fitting at IFA to CGMTs QTR & Repairing of compound light at BSNL
Bhavan ,Type V QTR , CTO Compound ,Panbazar,. (Estimated Cost: 48497) |
02-DEC-20 15.30 Hrs. |
|
|
Electrical Division, Guwahati |
NIT No:52/AC-(5)54/NIT/BSNL/GHED/2020-21/13 |
30-NOV-20 16 / |
11/23/2020 14:07 |
ID: 11202 |
|
|
Repairing & Servicing
of 125 KVA DEA set at MBM Rangia , Under Kamrup SSA. (Estimated Cost:
46941) |
02-DEC-20 15.30 Hrs. |
|
|
Electrical Division, Guwahati |
NIT No:51/AC-(5)54/NIT/BSNL/GHED/2020-21/12 |
30-NOV-20 16 / |
11/23/2020 14:05 |
ID: 11201 |
|
|
Replacement of faulty Power
Cable from ASEB Service Pole to Meter Panel at BTS Colony Bazar. Under Kamrup
SSA. (Estimated Cost: 19728) |
02-DEC-20 15.30 Hrs. |
|
|
Civil Division, Tezpur |
NIT No:NIT No. 04/NIT/BSNL/CD-TZP/2020-21 |
28-NOV-20 15:00 / |
11/23/2020 12:49 |
ID: 11200 |
|
|
C/o 15mtr / 20.0mtr high
RTT including foundation, erection, painting, aviation lamp, earthling and
cable runway at Mangaldoi college site under Tezpur SSA (Estimated
Cost: 493100) |
28-NOV-20 18:00 Hrs. |
|
|
Civil Division, Tezpur |
NIT No:08/NIT/BSNL/CD-TZP/2020-21 |
28-NOV-20 15.00 / |
11/23/2020 11:50 |
ID: 11199 |
|
|
C/o 15mtr / 20.0mtr high
RTT including foundation, erection, painting, aviation lamp, earthling and
cable runway at RAIDANGIA site under Nagaon SSA (Estimated Cost:
493100) |
28-NOV-20 18.00 Hrs. |
|
|
Civil Division, Tezpur |
NIT No:07/NIT/BSNL/CD-TZP/2020-21 |
28-NOV-20 15.00 / |
11/23/2020 11:48 |
ID: 11198 |
|
|
C/o 15mtr / 20.0mtr high
RTT including foundation, erection, painting, aviation lamp, earthling and
cable runway at AAUNIATI site under Nagaon SSA (Estimated Cost: 493100) |
28-NOV-20 18.00 Hrs. |
|
|
Civil Division, Tezpur |
NIT No:06/NIT/BSNL/CD-TZP/2020-21 |
28-NOV-20 15.00 / |
11/23/2020 11:44 |
ID: 11197 |
|
|
C/o 15mtr / 20.0mtr high
RTT including foundation, erection, painting, aviation lamp, earthling and
cable runway at KETLA (CATHOLIC CHURCH) site under Tezpur SSA
(Estimated Cost: 493100) |
28-NOV-20 18.00 Hrs. |
|
|
Civil Division, Tezpur |
NIT No:05/NIT/BSNL/CD-TZP/2020-21 |
28-NOV-20 15.00 / |
11/23/2020 11:39 |
ID: 11196 |
|
|
C/o 15mtr / 20.0mtr high
RTT including foundation, erection, painting, aviation lamp, earthing and
cable runway at HATBOR site under Nagaon SSA (Estimated Cost: 493100) |
28-NOV-20 15.00 Hrs. |
|
|
Civil Division, Tezpur |
NIT No:04/NIT/BSNL/CD-TZP/2020-21 |
28-NOV-20 15.00 / |
11/23/2020 11:34 |
ID: 11195 |
|
|
C/o 15mtr / 20.0mtr high
RTT including foundation, erection, painting, aviation lamp, earthling and
cable runway at Mangaldoi college site under Tezpur SSA (Estimated
Cost: 493100) |
28-NOV-20 18.00 Hrs. |
|
|
Electrical Division, Guwahati |
NIT No:QTN-2(17)/BSNL/GHED/2020-21/ 458 |
12-NOV-20 16 / |
11/16/2020 15:33 |
ID: 11194 |
|
|
Replacement of damaged
batteries for Automatic Rescue Device(ARD) for Lift No-2 at (Estimated
Cost: 27856) |
16-NOV-20 15.30 Hrs. |
|
|
Civil Division, Jorhat |
NIT No:06/BSNL/CD-JRT/20-21 |
18-NOV-20 18:00 / |
11/12/2020 14:33 |
ID: 11193 |
|
|
Construction of
15.00M/20.00 M high Roof Top Tower including foundation, erection, painting,
aviation lamp, earthing, and cable runway at TI Ford , Laipuli under
Dibrugarh SSA. (Estimated Cost: 498239) |
18-NOV-20 18:00 Hrs. |
|
|
Civil Division, Jorhat |
NIT No:05/BSNL/CD-JRT/20-21 |
18-NOV-20 18:00 / |
11/12/2020 14:31 |
ID: 11192 |
|
|
Construction of
15.00M/20.00 M high Roof Top Tower including foundation, erection, painting,
aviation lamp, earthing, and cable runway at Majgaon, Nij Khowang under
Dibrugarh SSA. (Estimated Cost: 498239) |
18-NOV-20 18:00 Hrs. |
|
|
Civil Division, Jorhat |
NIT No:04/BSNL/CD-JRT/20-21 |
18-NOV-20 18:00 / |
11/12/2020 14:28 |
ID: 11191 |
|
|
Construction of 20.00 M
high Roof Top Tower including erection, earthing, painting, aviation lamp and
cable runway etc. at Panchali, Golaghat under Jorhat SSA. (Estimated
Cost: 507350) |
18-NOV-20 18:00 Hrs. |
|
|
Civil Division, Jorhat |
NIT No:3/BSNL/CD-JRT/20-21 |
12-NOV-20 18:15 / |
11/12/2020 14:19 |
ID: 11190 |
|
|
Construction of 20.00 M
high Roof Top Tower including erection, earthing, painting, aviation lamp and
cable runway etc. at Rajmai, Sibsagar under Jorhat SSA. (Estimated
Cost: 507350) |
18-NOV-20 18:00 Hrs. |
|
|
Circle Office, Guwahati |
NIT No:ASM/Mktg/EOI-Franchisee/2019-20/27 Dated 11/11/2020 |
20-NOV-20 14:00 / |
11/11/2020 14:42 |
ID: 11189 |
|
|
***EOI***Franchisee-ship of
sale of BSNL products and provision of services to BSNL in Jorhat SSA(
Franchisee area of Jorhat PSA I ) (Estimated Cost: 0) |
20-NOV-20 17:30 Hrs. |
|
|
Electrical Division, Guwahati |
NIT No:50/AC-(5)54/NIT/BSNL/GHED/2020-21/11 |
16-NOV-20 16 / |
11/7/2020 16:00 |
ID: 11188 |
|
|
Restoration of 11KV Power
supply by replacing GOAB & DOLU switch at BTS Kendokona & Singarpar
,( Under Kamrup SSA) (Estimated Cost: 37380) |
18-NOV-20 15.30 Hrs. |
|
|
Electrical Division, Guwahati |
NIT No:49/AC-(5)54/NIT/BSNL/GHED/2020-21/12 |
16-NOV-20 16 / |
11/7/2020 15:57 |
ID: 11187 |
|
|
Repalcement of Conventional
Light fitting to LED Fitting at BSNL Bhavan Lift Lobby & Type V Qtr
,Panbazar,. (Estimated Cost: 47606) |
18-NOV-20 15.30 Hrs. |
|
|
Electrical Division, Guwahati |
NIT No:48/AC-(5)54/NIT/BSNL/GHED/2020-21/13 |
16-NOV-20 16 / |
11/7/2020 15:53 |
ID: 11186 |
|
|
Shifting, Installation of 1
X 15 KVA DE/A set from BTS Balijana to BTS Tarangapur , Goalpara ,Under
Bongaigaon SSA .( SH:- Repairing & Serviceing of 15 KVA DE/A set ).
(Estimated Cost: 38658) |
18-NOV-20 15.30 Hrs. |
|
|
Electrical Division, Guwahati |
NIT No:47/AC-(5)54/NIT/BSNL/GHED/2020-21/14 |
16-NOV-20 16 / |
11/7/2020 15:51 |
ID: 11185 |
|
|
Restoration of 11KV Power
supply at BTS Geruah, Kusdua ,Smlitola & Nizkursakti Goalpara ,Under
Bongaigaon SSA . (Estimated Cost: 47500) |
18-NOV-20 15.30 Hrs. |
|
|
Silchar SSA |
NIT No:NIT No. WS-435/PT-II/GM/SC/SMPS PP module/2020-2021/02
Dated 04.11.2020 |
25-NOV-20 14.00 / |
11/6/2020 10:26 |
ID: 11184 |
|
|
Repairing of various
Types/Makes and capacity of SMPS Power Plant Modules in Silchar SSA
(Estimated Cost: 2389723) |
25-NOV-20 1400 Hrs. |
|
|
Silchar SSA |
NIT No:WS-452(II)/SLA BASE OFC TENDER/CACHAR/2020-21 DATED
04-11-2020 |
24-NOV-20 14.00 / |
11/4/2020 12:27 |
ID: 11183 |
|
|
SLA BASED OFC MAINTENANCE
IN CACHAR DISTRICT UNDER SILCHAR SSA (Estimated Cost: 1527960) |
24-NOV-20 14.00 Hrs. |
|
|
Jorhat SSA |
NIT No:GMTD/JRT/PLG/WN-4738/Rigger/E-Tender/2020-21/07 dated
02-11-2020 |
24-NOV-20 14:00 / |
11/3/2020 13:49 |
ID: 11182 |
|
|
Supply of Riggers in Jorhat
SSA (Estimated Cost: 531360) |
25-NOV-20 15:00 Hrs. |
|
|
Civil Division, Guwahati |
NIT No:NITNo19/BSNL/GHCD/20-21) |
29-OCT-20 16:00 / |
10/27/2020 10:51 |
ID: 11181 |
|
|
Replacing of unserviceable
GI sheet roofing to arresting leakage from roof ,Cleaning of drain, jungle
and Misc. civil works at Inspection Bungalow building CTO compound ,Panbazar
Guwahati. (Estimated Cost: 162495) |
31-OCT-20 15:00 Hrs. |
|
|
Civil Division, Guwahati |
NIT No:NITNo18/BSNL/GHCD/20-21) |
29-OCT-20 16:00 / |
10/26/2020 16:33 |
ID: 11180 |
|
|
Replacement of
unserviceable curtain rods, furniture polishing , removing tree plants from
external walls of building and Misc. civil works CGMTs QTR No 601, CTO
Compound ,Panbazar , Guwahati . (Estimated Cost: 63,169.00) |
31-OCT-20 15:00 Hrs. |
|
|
Civil Division, Guwahati |
NIT No:NITNo17/BSNL/GHCD/20-21) |
29-OCT-20 16:00 / |
10/26/2020 16:06 |
ID: 11179 |
|
|
Repairing and maintenance
works of DGM (P&A) Chamber, General section, Admn. Section and Accound
section at Second floor of BSNL Bhavan at CTO compound Panbazar,
Guwahati. (Estimated Cost: 98001.00) |
31-OCT-20 15:00 Hrs. |
|
|
Bongaigaon SSA |
NIT No:WX- 9579 / Bongaigaon /Outsourcing/Semi-Urban/2020-21/1
Dated: 17-07-2020 |
16-NOV-20 13:00 / |
10/26/2020 15:46 |
ID: 11178 |
|
|
Tender document for
Outsourcing of Maintenance and provisioning of Landline & Broadband for
External plant of Copper Network for Semi-Urban exchanges under Bongaigaon
& Goalpara District, Bongaigaon SSA. (Estimated Cost: 1829376.00) |
16-NOV-20 13:00 Hrs. |
|
|
Electrical Division, Guwahati |
NIT No:46/AC-(5)54/NIT/BSNL/GHED/2020-21/10 |
31-OCT-20 16 / |
10/26/2020 13:16 |
ID: 11177 |
|
|
Repairing, rewinding of
faulty 25KVA transformer & ITC of repaired transformer at Batakuchi ,
Under Kamrup SSA. (Estimated Cost: 48450) |
02-NOV-20 15.30 Hrs. |
|
|
Civil Division, Guwahati |
NIT No:NITNo16/BSNL/GHCD/20-21) |
28-OCT-20 16:00 / |
10/26/2020 11:10 |
ID: 11176 |
|
|
Repairing and maintenance
works of type-IV staff quarters No. 702 at CTO compound Panbazar,
Guwahati. (Estimated Cost: 75,322.00) |
29-OCT-20 15:00 Hrs. |
|
|
Bongaigaon SSA |
NIT No:No.G-91/HV-Tender/GMTD/BGN/2020-21/9 |
11-NOV-20 14:00 / |
10/23/2020 13:53 |
ID: 11175 |
|
|
E-TENDER FOR HIRING OF
COMMERCIAL VEHICLES FOR MAINTENANCE WORKS OF BONGAIGAON TELECOM
DISTRICT (Estimated Cost: 5719650) |
11-NOV-20 14:00 Hrs. |
|
|
Circle Office, Guwahati |
NIT No:ASM/CO/IT/SA/2020-21 Dated 23/10/2020 |
29-OCT-20 16:00 / |
23-10-2020 13:00 |
ID: 11174 |
|
|
****NIQ**** NOTICE INVITING
QUOTATION (NIQ) FOR RE-DESIGN AND SECURITY TESTING OF THE EXSISTING OFFICIAL
WEBSITE OF BSNL, ASSAM TELECOM CIRCLE at URL
http://www.assam.bsnl.co.in (Estimated Cost: 97000) |
31-OCT-20 14:00 Hrs. |
|
|
Electrical Division, Guwahati |
NIT No:44//AC-(5)54/NIT/BSNL/GHED/2020-21/12 |
28-OCT-20 14:00 / |
20-10-2020 16:39 |
ID: 11173 |
|
|
Replacement of faulty Power
Cable from ASEB Service Pole/Meter to BTS Roomat BTSI
ssapurhati,AmbariTown,sundaria Pather ( Under Bongaigaon SSA.)
(Estimated Cost: 47380) |
30-OCT-20 15:30 Hrs. |
|
|
Electrical Division, Guwahati |
NIT No:43//AC-(5)54/NIT/BSNL/GHED/2020-21/9 |
28-OCT-20 16:00 / |
20-10-2020 16:37 |
ID: 11172 |
|
|
Repairing&servicing of
19 nos7 TRpackage A
CunitatOCBTax,MSC,OCBLOCAL&NIBPanbazarTE(SH:-ITCof3x1.5TRSplitAC with
alliedelectrical works at MSC, Panbazar). (Estimated Cost: 42344) |
30-OCT-20 15:30 Hrs. |
|
|
Electrical Division, Guwahati |
NIT No:41//AC-(5)54/NIT/BSNL/GHED/2020-21/11 |
28-OCT-20 16 / |
10/20/2020 16:10 |
ID: 11171 |
|
|
Shifting, Installation of 1
X 15 KVA DE/A set from BTS Balijana to BTS Tarangapur , Goalpara ,Under
Bongaigaon SSA .(SH:- Dismantling,Shifting &Transporation of 15 KVA DEA
set). (Estimated Cost: 47737) |
30-OCT-20 15.30 Hrs. |
|
|
Electrical Division, Guwahati |
NIT No:42//AC-(5)54/NIT/BSNL/GHED/2020-21/8 |
28-OCT-20 16 / |
10/20/2020 16:03 |
ID: 11170 |
|
|
Repairing ,Serviceing of
1.5 TR Split AC & Repalcement of Light fitting at CGMTs QTR No 601, CTO
Compound ,Panbazar. (Estimated Cost: 44910) |
30-OCT-20 15.30 Hrs. |
|
|
Civil Division, Guwahati |
NIT No:NIQ No.3/BSNL/GHCD/20-21) |
21-OCT-20 16:00 / |
10/20/2020 11:47 |
ID: 11169 |
|
|
Scientific cleaning of
overhead water storage tanks and underground water tanks at wireless
compound, Dispur Guwahati (Estimated Cost: 77994.00) |
22-OCT-20 15:00 Hrs. |
|
|
Civil Division, Guwahati |
NIT No:NITNo15/BSNL/GHCD/20-21) |
21-OCT-20 16:00 / |
10/19/2020 10:35 |
ID: 11168 |
|
|
Repairing and maintenance
work of Type-V staff quarter No. 301 at CTO compound, Panbazar, Guwahati
(against new allotment). (Estimated Cost: 81660) |
22-OCT-20 15:00 Hrs. |
|
|
Civil Division, Silchar |
NIT No:05/CD-BSNL/SC/2020-21/CSD/Silchar |
27-OCT-20 16.00 / |
10/17/2020 14:34 |
ID: 11167 |
|
|
Surging of Deep Tube Well
at BSNL Qtr. Compound, Circuit House Road, Silchar (Estimated Cost:
33500) |
28-OCT-20 15.00 Hrs. |
|
|
Civil Division, Silchar |
NIT No:04/CD-BSNL/SC/2020-21/CSD/Siulchar |
27-OCT-20 16.00 / |
10/17/2020 14:32 |
ID: 11166 |
|
|
Removing problems in water
supply system and some misc. Civil Works in GMTD Bldg. and Annex Bldg. at
Daccaipatty Silchar, (Silchar SSA) (Estimated Cost: 44020.00) |
28-OCT-20 15.00 Hrs. |
|
|
Civil Division, Silchar |
NIT No:03/CD-BSNL/SC/2020-21/CSD Silchar |
27-OCT-20 16.00 / |
10/17/2020 14:29 |
ID: 11165 |
|
|
Construction of septic tank
cover i/c related civil works at Circuit House quarter campus Silchar,
(Silchar SSA). (Estimated Cost: 32020.00) |
28-OCT-20 15.00 Hrs. |
|
|
Civil Division, Silchar |
NIT No:02/CD-BSNL/SC/2020-21/CSD |
27-OCT-20 16.00 / |
10/17/2020 12:43 |
ID: 11164 |
|
|
Arrangement for proper
disposal of sewage and some misc. civil works in East block, ground floor,
type-II qtr. at circuit house road, Silchar.(silchar SSA). (Estimated
Cost: 37170) |
28-OCT-20 15.00 Hrs. |
|
|
Bongaigaon SSA |
NIT No:Tender No: WX-9472/Tender/Rigger/2020-21/2 Dated:
13-07-2020 |
06-NOV-20 14.00 Hrs / |
10/17/2020 12:13 |
ID: 11163 |
|
|
Providing Rigger Services
on Call Basis (Per Day Basis) for R. F. Optimization & Micro alignment of
GSM, Wi-Fi Hot Spot, Minilink & Radio Modem etc of Bongaigaon SSA
(Estimated Cost: 11,68,221/-) |
06-NOV-20 14:00 Hrs. |
|
|
Bongaigaon SSA |
NIT No:WX-9485/Transportation/2020-21/01 Date: 08.10.2020 |
02-NOV-20 12:00 / |
10/15/2020 12:08 |
ID: 11162 |
|
|
Carriage of telecom stores
by mechanical transport (By road) from Bongaigaon Store Depot to different
places of Bongaigaon SSA and also to and from other SSA of BSNL including all
loading, unloading and staking properly in position completely as dire
(Estimated Cost: Rs.25,00,000/-) |
02-NOV-20 12:00 Hrs. |
|
|
Civil Division, Jorhat |
NIT No:04/BSNL/CD-JRT/2020-21 |
16-OCT-20 16:00 / |
10/14/2020 11:49 |
ID: 11161 |
|
|
Provision of antistatic
flooring for installation of DWDM Equipment under NFS Project at Air Force
Station DINJAN- I I under BSNL Civil Division, Jorhat, Assam.. (2nd
Call) (Estimated Cost: 68254) |
17-OCT-20 15:00 Hrs. |
|
|
Civil Division, Jorhat |
NIT No:13 /NIQ/BSNL/CD-JRT/2019-20 |
16-OCT-20 16:00 / |
10/14/2020 11:46 |
ID: 11160 |
|
|
Provision of antistatic
flooring for Army site under NFS DWDM Project at Army station Dibrugarh,
under BSNL Civil Division, Jorhat, Assam. (2nd Call) (Estimated Cost:
50762) |
17-OCT-20 15:00 Hrs. |
|
|
Dibrugarh SSA |
NIT No:MM-766/GMTD.DR/SMPS/2020-2021/ |
10-OCT-20 09:00 / |
10/13/2020 16:41 |
ID: 11159 |
|
|
REPAIRING OF VARIOUS
CAPACITY & TYPES OF SMPS POWER PLANT MODULES & CONTROL PANELS
INCLUDING ALARM PANELS IN DIBRUGARH SSA (Estimated Cost: 1759100) |
02-NOV-20 15:00 Hrs. |
|
|
|
|
|
Annex-I |
|
|
Civil Division, Jorhat |
NIT No:02/NIQ/BSNL/CD-JRT/2020-21 |
17-OCT-20 18:00 / |
10/13/2020 12:37 |
ID: 11158 |
|
|
Provision of antistatic
flooring for installation of DWDM Equipment under NFS Project at Air Force
Station DINJAN – I under BSNL Civil Division, Jorhat, Assam(3rd call).
(Estimated Cost: 272825.00) |
17-OCT-20 18.00 Hrs. |
|
|
Civil Division, Guwahati |
NIT No:NITNo14/BSNL/GHCD/20-21) |
08-OCT-20 16:00 / |
6/10/2020 10:43 |
ID: 11157 |
|
|
Repairing and maintenance
work of Type-V staff quarter No. 601 at CTO compound, Panbazar, Guwahati
(against new allotment). (Estimated Cost: 91217) |
09-OCT-20 15:00 Hrs. |
|
|
Civil Division, Jorhat |
NIT No:02/BSNL/CD-JRT/2020-21 |
06-OCT-20 18:00 / |
1/10/2020 12:32 |
ID: 11156 |
|
|
Provision of antistatic
flooring for installation of DWDM Equipment under NFS Project at Air Force
Station DINJAN – I under BSNL Civil Division, Jorhat, Assam(2nd call).
(Estimated Cost: 272825) |
06-OCT-20 18:00 Hrs. |
|
|
Civil Division, Jorhat |
NIT No:02/BSNL/CD-JRT/2020-21 |
26-SEP-20 18:00 / |
25-09-2020 10:23 |
ID: 11155 |
|
|
Provision of antistatic
flooring for installation of DWDM Equipment under NFS Project at Air Force
Station DINJAN – I under BSNL Civil Division, Jorhat, Assam. (Estimated
Cost: 272825) |
26-SEP-20 18.00 Hrs. |
|
|
Electrical Division, Guwahati |
NIT No:40/AC-(5)54/NIT/BSNL/GHED/20-21/383 |
28-SEP-20 16 / |
23-09-2020 14:52 |
ID: 11154 |
|
|
Repairing, rewinding of
faulty 315KVA transformer & ITC of repaired transformer & Replacement
of Faulty cable from Transformer to MV panel. , at BSNL Bhavan,
Panbazar (Estimated Cost: 174253) |
30-SEP-20 15.30 Hrs. |
|
|
Electrical Division, Guwahati |
NIT No:39/AC (5)54/NIT/BSNL/GHED/2020-21/382 |
28-SEP-20 16:00 / |
22-09-2020 13:00 |
ID: 11153 |
|
|
Repairing, rewinding of
faulty 25KVA transformer & ITC of repaired transformer at Various BTS
Under Bongaigaon SSA. ( Rate Contract) ( 2nd Call) (Estimated Cost:
199,152.00) |
30-SEP-20 15:30 Hrs. |
|
|
Electrical Division, Guwahati |
NIT No:38/AC (5)54/NIT/BSNL/GHED/2020-21/380 |
28-SEP-20 16:00 / |
22-09-2020 12:57 |
ID: 11152 |
|
|
Modification of computer
wiring ,Data cable with allied electrical works at 2nd Floor Accounts section
BSNL Bhavan, Panbazar, Guwahati. (Estimated Cost: 75084) |
30-SEP-20 15:30 Hrs. |
|
|
Electrical Division, Guwahati |
NIT No:33/AC-(5)54/NIT/BSNL/GHED/2020-21/7 |
27-SEP-20 16 / |
21-09-2020 15:21 |
ID: 11151 |
|
|
Shifting & installation
of 15 KVA DE/A set ( Recovered from Hotel Brahmaputra ) TE Demow under Kamrup
SSA. (Estimated Cost: 42270) |
29-SEP-20 15.30 Hrs. |
|
|
Bongaigaon SSA |
NIT No:G-91/HV-Tender/GMTD/BGN/2020-21/04 Dated at Bongaigaon,
the 27/08/2020 |
26-SEP-20 14.00 Hrs / |
28-08-2020 13:16 |
ID: 11138 |
|
|
E-TENDER FOR HIRING OF
COMMERCIAL VEHICLES FOR MAINTENANCE WORKS OF BONGAIGAON TELECOM
DISTRICT (Estimated Cost: ) |
26-SEP-20 14:00 Hrs. |
|
|
Nagaon SSA |
NIT No:WX-3069/e-TENDER/House Keeping/NGG/2020-21/10 Date
10/09/2020 |
03-OCT-20 11:30 / |
15-09-2020 12:36 |
ID: 11150 |
|
|
e- Tender for Providing
House Keeping Services in ILT Building,Nagaon & GMTD Building,Nagaon in
Nagaon SSA. (Estimated Cost: 1385496) |
03-OCT-20 11:30 Hrs. |
|
|
Civil Division, Jorhat |
NIT No:04/NIQ/BSNL/CD-JRT/2020-21 |
18-SEP-20 16:00 / |
15-09-2020 11:01 |
ID: 11149 |
|
|
Provision of antistatic flooring for
installation of DWDMM Equipment under NFS Project at Air Force Station DINJAN
- I I under BSNL Civil Division, Jorhat, Assam. (Estimated Cost:
68254) Corrigendum |
19-SEP-20 15:00 Hrs. |
|
|
|
|
|
|
|
|